0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Using the Last Planner® System to tackle the social aspects of BIM-enabled MEP coordination

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1139/cjce-2018-0424.
  • About this
    data sheet
  • Reference-ID
    10364064
  • Published on:
    12/08/2019
  • Last updated on:
    30/01/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine