0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Using the HAZOP Method to Conduct a Risk Assessment on the Dismantling of Large Industrial Machines and Associated Structures: Case Study

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)co.1943-7862.0001942.
  • About this
    data sheet
  • Reference-ID
    10473406
  • Published on:
    27/10/2020
  • Last updated on:
    27/10/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine