Using the Earned Value Management System to Improve Electrical Project Control
Author(s): |
Awad S. Hanna
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, March 2012, n. 3, v. 138 |
Page(s): | 449-457 |
DOI: | 10.1061/(asce)co.1943-7862.0000426 |
- About this
data sheet - Reference-ID
10166222 - Published on:
11/12/2018 - Last updated on:
11/12/2018