0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies

Author(s):



Medium: journal article
Language(s): English
Published in: Construction Innovation, , n. 3, v. 20
Page(s): 471-508
DOI: 10.1108/ci-11-2019-0133
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ci-11-2019-0133.
  • About this
    data sheet
  • Reference-ID
    10424866
  • Published on:
    11/06/2020
  • Last updated on:
    11/07/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine