0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Using Early Dispute-Resolution Techniques to Reduce Delay and Minimize Project Expense

Author(s): (Mediator and Arbitrator, Schiff Hardin LLP, 233 S. Wacker Dr., Chicago, IL 60606.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 3, v. 9
Page(s): 02517002
DOI: 10.1061/(asce)la.1943-4170.0000237
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000237.
  • About this
    data sheet
  • Reference-ID
    10579849
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine