0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Usefulness and fields of the application of the Earned Value Management in the implementation of construction projects

This publication lists 22 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10475877
  • Published on:
    25/11/2020
  • Last updated on:
    25/11/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine