0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Use of the Freezing Process in the Construction of a Pumping Station and Storm-Water Overflow at Fleetwood, Lancashire

Author(s):

Medium: journal article
Language(s): English
Published in: Proceedings of the Institution of Civil Engineers, , n. 2, v. 12
Page(s): 175-186
DOI: 10.1680/iicep.1959.12124
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1680/iicep.1959.12124.
  • About this
    data sheet
  • Reference-ID
    10266785
  • Published on:
    10/01/2019
  • Last updated on:
    10/01/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine