Urban Freeway Bridge Reconstruction Planning: Case of Mockingbird Bridge
Author(s): |
James T. O'Connor
Tamer E. El-Diraby |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, January 2000, n. 1, v. 126 |
Page(s): | 61-67 |
DOI: | 10.1061/(asce)0733-9364(2000)126:1(61) |
- About this
data sheet - Reference-ID
10143858 - Published on:
11/12/2018 - Last updated on:
11/12/2018