0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Author(s):
Medium: journal article
Language(s): English
Published in: Civil Engineering Magazine, , n. 9, v. 61
Page(s): 62-63
Abstract:

Nearly 500 bridges have failed because of hydraulic conditions—primarily scour—since 1950, but the collapse of the Route 90 bridge over Schoharie Creek in April 1987 focused national attention on the issue. Procedures developed by the Federal Highway Administration call for a team approach, which includes qualified hydraulic, structural and geotechnical engineers, each with several years of experience. Procedures used to counter scour include installation of riprap, guide banks, steel sheetpiles and underpinning. However, FHWA has left the ways and means of coping with scour to each of the state departments of transportation. New York State DOT, for one, with its aggressive approach to scour, summoned an independent task force. New York’s strategy may be adopted or modified by other states, such as Colorado, and the techniques for scour evaluation in general will evolve as more states establish programs to comply with FHWA requirements.

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10015662
  • Published on:
    25/07/2004
  • Last updated on:
    14/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine