0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Understanding Social Interaction and Physiological Patterns in Nonlean and Last Planner System–Based Project Teams: A Comparative Study Using Immersive Virtual Reality

This publication lists 102 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10791308
  • Published on:
    01/09/2024
  • Last updated on:
    01/09/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine