Author(s): |
Abid Loan
Lester LaFountain |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Civil Engineering Magazine, October 2003, n. 10, v. 73 |
Abstract: |
In capping a 190-acre hazardous landfill in metropolitan Los Angeles, engineers saved time and money by relying on a construction method seldom used in the environmental sector: design/build. |