0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Two Test Level 4 Bridge Railing and Transition Systems for Transverse Timber Deck Bridges

Author(s):




Medium: journal article
Language(s): English
Published in: Transportation Research Record: Journal of the Transportation Research Board, , n. 1, v. 1696
Page(s): 334-351
DOI: 10.3141/1696-35
Abstract:

The Midwest Roadside Safety Facility, in cooperation with the Forest Products Laboratory, which is part of the U.S. Department of Agriculture’s Forest Service, and FHWA, designed two bridge railing and approach guardrail transition systems for use on bridges with transverse glue-laminated timber decks. The bridge railing and transition systems were developed and crash tested for use on higher-service-level roadways and evaluated according to the Test Level 4 safety performance criteria presented in NCHRP Report 350: Recommended Procedures for the Safety Performance Evaluation of Highway Features. The first railing system was constructed with glulam timber components, whereas the second railing system was configured with steel hardware. Eight full-scale crash tests were performed, and the bridge railing and transition systems were acceptable according to current safety standards.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3141/1696-35.
  • About this
    data sheet
  • Reference-ID
    10778473
  • Published on:
    12/05/2024
  • Last updated on:
    12/05/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine