0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Two-stage stochastic programming for risk-aware scheduling of energy hubs participating in day-ahead and real-time electricity markets

This publication lists 32 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10661980
  • Published on:
    23/03/2022
  • Last updated on:
    23/03/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine