0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Tunnelausbau mit schweren Stahlprofilen beim Vortrieb des Straight Creekt Tunnels

Author(s):
Medium: journal article
Language(s): German
Published in: Stahlbau, , n. 3, v. 39
Page(s): 88-89
Available from: Refer to publisher

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10071274
  • Published on:
    05/02/2015
  • Last updated on:
    04/10/2016
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine