0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Transmisión de cargas entre forjados, durante el proceso constructivo: Medidas realizadas en obra

Author(s):



Medium: journal article
Language(s): English, Spanish
Published in: Hormigón y acero, , n. 178, v. 42
Page(s): 37-47
Abstract:

Transmission of loads among floors during the construction process. Measures carried out in the job

The results of the measures taken in a construction, by means of loading cells, of the stresses which comes out on the foundation props when there are three stories propped up in a ten storey construction process of a tall building in the town of Benidorm, are studied in this paper. On analyze the stresses which comes out in the floors and their load distribution, when loading and removing the props.

Available from: ACHE - Asociación Española de Ingeniería Estructural
Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10076264
  • Published on:
    27/02/2019
  • Last updated on:
    27/02/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine