0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Time for Development of Internal Erosion and Piping in Embankment Dams

Author(s): (Professor, School of Civil and Environmental Engineering, Univ. of New South Wales, Sydney NSW 2052, Australia.)
(Research Engineer, School of Civil and Environmental Engineering, Univ. of New South Wales, Sydney NSW 2052, Australia.)
(Senior Geotechnical Engineering Specialist, U.S. Bureau of Reclamation, P.O. Box 25007, Denver, Colorado 80215.)
(Associate, URS Australia, 116 Miller Street, North Sydney NSW 2060, Australia.)
Medium: journal article
Language(s): English
Published in: Journal of Geotechnical and Geoenvironmental Engineering, , n. 4, v. 129
Page(s): 307-314
DOI: 10.1061/(ASCE)1090-0241(2003)129:4(307)
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(ASCE)1090-0241(2003)129:4(307).
  • About this
    data sheet
  • Reference-ID
    10694535
  • Published on:
    11/12/2022
  • Last updated on:
    11/12/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine