Time-Cost Relationship for Predicting Construction Duration

Author(s):

Medium: journal article
Language(s): English
Published in: Budownictwo i Architektura, , n. 1, v. 12
Page(s): 023-030
DOI: 10.35784/bud-arch.2160
Abstract:

The paper aims at creating a model of road construction duration in the function of project qualities including the construction cost. The qualities considered are likely to be defined or possible to be estimated at early stages of project planning, giving no consideration to construction method or organisation of works. Potentially, the model might be applied by construction clients in their feasibility studies. It could also be used for comparing construction duration or construction rate with respect to project qualities.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.35784/bud-arch.2160.
  • About this
    data sheet
  • Reference-ID
    10476146
  • Published on:
    25/11/2020
  • Last updated on:
    25/11/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine