0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach

This publication lists 53 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10577059
  • Published on:
    26/02/2021
  • Last updated on:
    02/09/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine