Time-Cost Optimization of Construction Projects with Generalized Activity Constraints
Author(s): |
Athanasios P. Chassiakos
Serafim P. Sakellaropoulos |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, October 2005, n. 10, v. 131 |
Page(s): | 1115-1124 |
DOI: | 10.1061/(asce)0733-9364(2005)131:10(1115) |
- About this
data sheet - Reference-ID
10161097 - Published on:
11/12/2018 - Last updated on:
11/12/2018