Time and cost contingency management using Monte Carlo simulation
Author(s): |
Bradd A. Traynor
Mojtaba Mahmoodian |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Australian Journal of Civil Engineering, 2019, n. 1, v. 17 |
Page(s): | 11-18 |
DOI: | 10.1080/14488353.2019.1606499 |
- About this
data sheet - Reference-ID
10313037 - Published on:
30/06/2019 - Last updated on:
30/06/2019