0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Timber Bridge, Schiers, Switzerland

Author(s):
Medium: journal article
Language(s): English
Published in: Structural Engineering International, , n. 2, v. 3
Page(s): 73-74
DOI: 10.2749/101686693780612556
Abstract:

Schiers, a rural Alpine village, needed to replace a river crossing as part of a forest development project. The existing steel truss bridge, built in 1911 with a bearing capacity of 4 tons and which had replaced an earlier wooden bridge, no longer met contemporary standards and needs. Besides providing increased bearing capacity, it was also desired that the new bridge should be of modern design. Economy of construction and maintenance were important considerations, too, as was the wish for the bridge to have a long service life. After studying various proposals and taking many criteria into consideration, the local community once again opted for a timber bridge.

Structure Types

Geographic Locations

  • About this
    data sheet
  • Reference-ID
    10003473
  • Published on:
    18/09/2002
  • Last updated on:
    28/10/2016
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine