Tiefe Baugrube in Teildeckelbauweise am Alsterufer in Hamburg
Author(s): |
Christian Böttcher
Stephan Bäumer |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Bautechnik, November 2013, n. 11, v. 90 |
Page(s): | 753-758 |
DOI: | 10.1002/bate.201300069 |
Abstract: |
Deep excavation pit with partial concrete cover at Alsterufer in HamburgAlong with the development of an exclusive office- and business building with four underground parking levels an about 13 m deep excavation pit with diaphragm walls and natural bottom sealing was needed. Considering the sensitive neighbouring buildings only little deformation of the underground was acceptable. By using a pre-stressed inner framework as upper bracing and a partial concrete cover as lower bracing the requirements were fulfilled. Already during preliminary design calculated ground deformations could be approved by an extensive measuring program accompanying the project. |
Available from: | Refer to publisher |
- About this
data sheet - Reference-ID
10069400 - Published on:
15/12/2013 - Last updated on:
13/08/2014