Tiefe Baugrube in Teildeckelbauweise am Alsterufer in Hamburg

Author(s):

Medium: journal article
Language(s): German
Published in: Bautechnik, , n. 11, v. 90
Page(s): 753-758
DOI: 10.1002/bate.201300069
Abstract:

Deep excavation pit with partial concrete cover at Alsterufer in Hamburg

Along with the development of an exclusive office- and business building with four underground parking levels an about 13 m deep excavation pit with diaphragm walls and natural bottom sealing was needed. Considering the sensitive neighbouring buildings only little deformation of the underground was acceptable. By using a pre-stressed inner framework as upper bracing and a partial concrete cover as lower bracing the requirements were fulfilled. Already during preliminary design calculated ground deformations could be approved by an extensive measuring program accompanying the project.

Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/bate.201300069.
  • About this
    data sheet
  • Reference-ID
    10069400
  • Published on:
    15/12/2013
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine