Three Phases of Multifactor Modelling of Construction Processes

Author(s):

Medium: journal article
Language(s): Latvian
Published in: Journal of Civil Engineering and Management, , n. 2, v. 12
Page(s): 127-134
DOI: 10.3846/13923730.2006.9636384
Abstract:

A multifactor modelling the construction processes is a subject of the paper. Three phases and several steps of the proposed extended procedure are presented. Tools for these phases from chronometric testing to verifying the assumed model are indicated. The following elements of the procedure as multi‐ and partial regression, correlation analysis, sensitivity analysis and proposed model are presented. Besides the classic verification activities the method of artificial neural networks has been applied. The processes of assembly of structural corrugated steel plate structures are a background of the consideration.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3846/13923730.2006.9636384.
  • About this
    data sheet
  • Reference-ID
    10363274
  • Published on:
    12/08/2019
  • Last updated on:
    12/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine