The third tunnel boring machine for the Koralm Tunnel / Die dritte Tunnelvortriebsmaschine für den Koralmtunnel
Author(s): |
Andreas Kiesling
Harald Glösl Alex Nussbaumer |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2015, n. 6, v. 8 |
Page(s): | 481-488 |
DOI: | 10.1002/geot.201500043 |
Abstract: |
On contract KAT3 of the Koralm Tunnel, a multi-mode tunnel boring machine with a diameter of 9,940 mm and an overall length of about 250 m will be used. The capability of the machine to be rebuilt from earth pressure to hard rock mode will enable it to bore through geologically different rock mass zones. It will be assembled in the launching excavation at Mitterpichling and at the west portal on the site facilities area, where the entire necessary infrastructure and segment production plant are situated. The particular geological challenges demand preliminary trials and special equipment on the tunnel boring machine. |
Keywords: |
multi-mode TBM EPB mode hard rock mode conversion multimode TBM
|
Available from: | Refer to publisher |