0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Thinking about Delay, Disruption, and the Cumulative Impact of Multiple Changes

Author(s): (Professor of Construction Management, Dept. of Civil and Environmental Engineering, Univ. of California, Berkeley, CA 94704; and President, Ibbs Consulting Group, Oakland, CA 94618.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 3, v. 5
Page(s): 109-112
DOI: 10.1061/(asce)la.1943-4170.0000126
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000126.
  • About this
    data sheet
  • Reference-ID
    10579743
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine