0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A theoretical BIM-based framework for quantity take-off to facilitate progress payments: the case of high-rise building projects in Vietnam

Author(s): ORCID
ORCID
ORCID
Medium: journal article
Language(s): English
Published in: International Journal of Building Pathology and Adaptation, , n. 4, v. 42
Page(s): 704-728
DOI: 10.1108/ijbpa-10-2021-0139

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ijbpa-10-2021-0139.
  • About this
    data sheet
  • Reference-ID
    10658174
  • Published on:
    17/02/2022
  • Last updated on:
    20/09/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine