総武線市川・本八幡間外環こ道橋工事~鉄道高架橋のアンダーピニング~ (The Underpinning of Railway Viaduct with Tokyo-Gaikan Expressway Construction of Sobu-Line between Ichikawa Station and Motoyawata Station)
Author(s): |
S. Nakamura
T. Osato H. Sanmaru T. Kameyama |
---|---|
Medium: | journal article |
Language(s): | Japanese |
Published in: | Concrete Journal (JCI), 2014, n. 7, v. 52 |
Page(s): | 589-594 |
DOI: | 10.3151/coj.52.589 |
- About this
data sheet - Reference-ID
10438270 - Published on:
08/10/2020 - Last updated on:
08/10/2020