0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Terex cutting units involved in tunnel overhaul project / Terex-Anbaufräsen im Einsatz bei einer Tunnelsanierung

Medium: journal article
Language(s): English, German
Published in: Geomechanics and Tunnelling, , n. 4, v. 5
Page(s): 397-398
DOI: 10.1002/geot.201290030
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.201290030.
  • About this
    data sheet
  • Reference-ID
    10066960
  • Published on:
    05/09/2012
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine