0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Temporary Works Toolkit. Part 13: The importance of understanding construction methodology

Author(s):
Medium: journal article
Language(s): English
Published in: The Structural Engineer, , n. 7, v. 95
Page(s): 32-36
DOI: 10.56330/zhhl9984
Abstract:

This article presents a list of general, high-level considerations that relate to construction methodology and optimisation of temporary/permanent works, with a number of examples provided.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.56330/zhhl9984.
  • About this
    data sheet
  • Reference-ID
    10763009
  • Published on:
    23/03/2024
  • Last updated on:
    23/03/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine