Temporary Works Toolkit. Part 11: Temporary works associated with precast concrete bridge beam construction

Author(s):
Medium: journal article
Language(s): English
Published in: The Structural Engineer, , n. 5, v. 95
Page(s): 37-41
DOI: 10.56330/qdty4630
Abstract:

This article considers temporary works, in particular the use of temporary supports, to precast concrete bridge beams during deck construction.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.56330/qdty4630.