Temporary works for the project "Brenner rail axis, northern approach" / Bauprovisorien beim Projekt "Eisenbahnachse Brenner, Zulaufstrecke Nord"

Author(s):

Medium: journal article
Language(s): English, German
Published in: Geomechanics and Tunnelling, , n. 6, v. 2
Page(s): 733-741
DOI: 10.1002/geot.200900061
Abstract:

The term temporary works includes a very wide range of plant and equipment. This article looks into construction electricity supply, lighting and communications as well as access control and location systems as implemented for the project "Brenner rail axis, northern approach, Kundl/Radfeld-Baumkirchen".

Keywords:
infrastructure construction electricity supply temporary lighting site communications access control location system alarm system fibre optic network
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.200900061.
  • About this
    data sheet
  • Reference-ID
    10063803
  • Published on:
    19/11/2010
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine