Teaching how to integrate Last Planner System and the Safety and Health Management System = Enseñando a integrar el Last Planner System y el Sistema de Gestión de Seguridad y Salud
This publication lists 34 references to other publication(s):
Advertisement
About this data sheet
Reference-ID 10411534
Published on: 12/02/2020
Last updated on: 24/07/2020
Advertisement
Structurae cooperates with
Advertisement
You have exceeded your monthly download limit!
Structurae Plus subscribers can download 30 media files or data sets per month.
Structurae Pro users are limited to 50.
Do you really want to delete this item from your favorites?
The item was successfuly added to the shopping cart.Could not add item to the shopping cart. Please try again.This item has already been added to the shopping cart and cannot be added again.