쉴드TBM 추진시 세그먼트 두께영향에 대한 현장사례연구 (Effect of Segment thickness during Shield TBM tunnelling in case study)
Author(s): |
Sang-Hwan Kim
Hye-Yoon Lee |
---|---|
Medium: | journal article |
Language(s): | Korean |
Published in: | Journal of Korean Tunnelling and Underground Space Association (한국터널지하공간학회 논문집), 2013, n. 3, v. 15 |
Page(s): | 311-320 |
DOI: | 10.9711/ktaj.2013.15.3.311 |
Abstract: | This paper presents the effect of Segment thickness during Shield TBM tunnelling in case study. In order to perform this study, the ground condition developed in the investigation site are reviewed and analysed. It is also carried out the construction problems occurred in the site during Shield TBM tunnelling. Several Segments were broken partially during advance tunnel by jacking pressure. The data surveyed from site are analysed in order to investigate the cause of Segment break. The numerical and analytical evaluations are carried out to examine the effect of Segment behaviour. From the results, it is found that the main causes of Segment break may be the jacking system and Segment thickness. In addition, new jacking technique is suggested to install safely the Segment during advance tunnel by jacking. |
- About this
data sheet - Reference-ID
10394752 - Published on:
04/01/2020 - Last updated on:
24/01/2020