The Tauern tunnel first and second tubes from the contractor's viewpoint / Tauerntunnel erste und zweite Röhre aus der Sicht des Bauausführenden
Author(s): |
F. Weidinger
H. Lauffer |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2009, n. 1, v. 2 |
Page(s): | 24-32 |
DOI: | 10.1002/geot.200900002 |
Abstract: |
The construction of the first tube of the Tauern tunnels in the years 1970 to 1975 was a milestone in the development of the NATM and of modern tunnelling. Completely new methods were introduced and used successfully to overcome the strongly squeezing rock, which was the only possibility of mastering the large rock deformations and completing tunnelling within the planned deadline. |
Keywords: |
yielding elements squeezing rock tunnelling work equipment deformation joints ductile elements tunnelling technology deformation slots
|
Available from: | Refer to publisher |