0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Target cost contracts: an analysis of the interplay between fee, target, share and price

This publication lists 3 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10575728
  • Published on:
    27/02/2021
  • Last updated on:
    27/02/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine