Talbrücke Ganslandsiepen - Fertigung und Montage einer semi-integralen Talbrücke
Author(s): |
Stephan Langer
|
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Stahlbau, October 2013, n. 10, v. 82 |
Page(s): | 720-725 |
DOI: | 10.1002/stab.201310096 |
Abstract: |
Viaduct Ganslandsiepen, Germany - Manufacture and rigging of a semi-integrale viaduct.By the construction of the A44 between the junction Ratingen-East and the expansion of existing end of the A44 in Velbert is a continuous east west link between the Rhine and the Ruhr area created. To convert several rural roads and the Gansbach a 3-span bridge structure with individual spans of 64 m - 80 m - 64 m and a total span of 208 m is necessary. The valley is crossed at a height of up to 35 m. |
Keywords: |
balanced cantilever method pier superstructure cantilever erection pre-erection pillar steel-composite trapezoid box preassembly
|
Available from: | Refer to publisher |
Structures and Projects
Structure Types
- About this
data sheet - Reference-ID
10069327 - Published on:
15/12/2013 - Last updated on:
13/08/2014