System for Scheduling Highway Construction Projects
Author(s): |
D. Arditi
S. N. Bentotage |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Computer-Aided Civil and Infrastructure Engineering, March 1996, n. 2, v. 11 |
Page(s): | 123-139 |
DOI: | 10.1111/j.1467-8667.1996.tb00316.x |
- About this
data sheet - Reference-ID
10416158 - Published on:
05/03/2020 - Last updated on:
05/03/2020