0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Swift‐Constructed Demountable Blind Bolt for Fast Execution and Disassembling of SHS Connection

Author(s): (Department of Civil and Environmental Engineering The Hong Kong Polytechnic University Hung Hom Hong Kong China)
(Department of Civil and Environmental Engineering The Hong Kong Polytechnic University Hung Hom Hong Kong China)
Medium: journal article
Language(s): English
Published in: ce/papers, , n. 3-4, v. 6
Page(s): 428-433
DOI: 10.1002/cepa.2307
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/cepa.2307.
  • About this
    data sheet
  • Reference-ID
    10766821
  • Published on:
    17/04/2024
  • Last updated on:
    17/04/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine