0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Sustainability in a lot-sizing and scheduling problem with delivery time window and sequence-dependent setup cost consideration

Author(s):


Medium: journal article
Language(s): English
Published in: Sustainable Cities and Society, , v. 51
Page(s): 101718
DOI: 10.1016/j.scs.2019.101718
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.scs.2019.101718.
  • About this
    data sheet
  • Reference-ID
    10559262
  • Published on:
    02/02/2021
  • Last updated on:
    19/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine