Süderweiterung NürnbergMesse - Ausführung Halle 3A
Author(s): |
Christian Böttcher
Henning Kaufmann Andreas Diekmann Harald Päßler Manfred Zäuner |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Bautechnik, April 2014, n. 4, v. 91 |
Page(s): | 280-291 |
DOI: | 10.1002/bate.201400013 |
Abstract: |
South Extension of Nuremberg Fairground - Construction of Hall 3AThe second part of the report about Hall 3A focuses on distinctive features in the detailed design and the erection on site, regarding the aspects of geotechnics, concrete and steel construction. |
Keywords: |
workshop geometry construction schedule detailed design jointless shop drawings presetted geometry connection design erection sequence erection stages exposed concrete fair hall temporary works
|
Available from: | Refer to publisher |