0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Success Factors and Barriers of Last Planner System Implementation in the Gaza Strip Construction Industry

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.2174/1874836801812010389.
  • About this
    data sheet
  • Reference-ID
    10381041
  • Published on:
    22/11/2019
  • Last updated on:
    22/11/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine