Abstract:

The 1288 m long Han River tunnel connecting Yoido and Mapo - opened on December 30, 1996 - was constructed as a part of the 52 km long Seoul subway line No. 5, to improve the traffic conditions in Seoul. It lies 15.6-30 m below the riverbed. It is the first sub-aqueous tunnel in Korea. The New Austrian Tunneling Method was adopted as a construction method. A permanent monitoring system was installed to maintain the tunnel effectively. In order to monitor earth pressure, water pressure, and deformation of the tunnel cross section, monitoring pins, reflecting mirrors, electro-resistant type of sensors, and optical fiber sensors were installed for the daily measurement on the construction tunnel.

Geographic Locations

  • About this
    data sheet
  • Reference-ID
    10003851
  • Published on:
    20/09/2002
  • Last updated on:
    28/10/2016
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine