0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

盾构隧道始发水平冻结法施工温度场参数研究 (Study on Temperature Field Parameters of Shield Tunnel Starting Horizontal Freezing Method)

Author(s):
Medium: journal article
Language(s): Chinese
Published in: Hans Journal of Civil Engineering 的中文名称是土木工程, , n. 2, v. 12
Page(s): 120-131
DOI: 10.12677/hjce.2023.122015
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.12677/hjce.2023.122015.
  • About this
    data sheet
  • Reference-ID
    10713482
  • Published on:
    21/03/2023
  • Last updated on:
    21/03/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine