0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Study on launch tunnelling parameters of a shield tunnel buried in pebble soil with existing pipelines base on discrete continuous coupling numerical method

This publication lists 38 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10691059
  • Published on:
    23/09/2022
  • Last updated on:
    23/09/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine