A study of best management practices for enhancing productivity in building projects: construction methods perspectives
Author(s): |
Argaw Tarekegn Gurmu
Ajibade Ayodeji Aibinu Toong Khuan Chan |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Construction Economics and Building, September 2016, n. 3, v. 16 |
Page(s): | 1-19 |
DOI: | 10.5130/ajceb.v16i3.4882 |
Abstract: |
This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify the best management practices for construction methods. The qualitative data analysis reached saturation and resulted in a list of best practices for construction methods that are relevant to the local industry. The second phase used an industry-wide survey to prioritize the best practices. Accordingly, project start-up plan, traffic control plan, machinery positioning strategy, project completion plan, and dynamic site layout plan were shown to be the top five best practices for construction methods. The study also revealed that high levels of implementation of best practices are associated with low levels of project delays. The use of best practices also varied according to the project costs. There were no discernible differences between the top five best practices. The authors suggest that they should be implemented jointly to improve productivity in building projects. Contractors could use the logistic regression model developed, to predict the probability of exceeding a baseline productivity factor and, on that basis, implement corrective actions to achieve the desired level of productivity. |
- About this
data sheet - Reference-ID
10338535 - Published on:
05/08/2019 - Last updated on:
05/08/2019