Structure of Tunnel Digging and Loading Trolley and Calculation of Electronic Control System and Analysis of Common Faults of Electronic Control
Author(s): |
Zhang Mao Yi
Zhang qi jun |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Physics: Conference Series, 1 June 2019, n. 5, v. 1213 |
Page(s): | 052096 |
DOI: | 10.1088/1742-6596/1213/5/052096 |
Abstract: |
The tunneling truck is mainly used for tunneling construction. It has the functions of digging, loading, anchoring, and wet spraying.This paper analyses the main structure and working principle of tunnel digging and loading trolley, the selection and calculation of main electrical components, the overall calculation of tunnel digging and loading trolley, and the common electrical faults and troubleshooting methods. It has certain reference value for domestic counterparts. |
- About this
data sheet - Reference-ID
10671622 - Published on:
12/06/2022 - Last updated on:
12/06/2022