Structural Assessment of Concrete Cable-Stayed Bridge after Replacement of Closure Segment: The Service Stage
Author(s): |
Hongjiang Li
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Practice Periodical on Structural Design and Construction, August 2020, n. 3, v. 25 |
Page(s): | 04020023 |
DOI: | 10.1061/(asce)sc.1943-5576.0000508 |
Structure Types
- About this
data sheet - Reference-ID
10424678 - Published on:
10/06/2020 - Last updated on:
10/06/2020