0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Stochastic Project Scheduling Optimization for Multi-stage Prefabricated Building Construction with Reliability Application

Author(s): ORCID
ORCID
ORCID
Medium: journal article
Language(s): English
Published in: KSCE Journal of Civil Engineering, , n. 6, v. 27
Page(s): 2356-2371
DOI: 10.1007/s12205-023-2164-8
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s12205-023-2164-8.
  • About this
    data sheet
  • Reference-ID
    10726037
  • Published on:
    30/05/2023
  • Last updated on:
    02/09/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine