Statybos Įmonės Valdymo Koordinavimo Sistema/The system of management coordination at building enterprises
Author(s): |
Romualdas Ginevičius
|
---|---|
Medium: | journal article |
Language(s): | Latvian |
Published in: | Journal of Civil Engineering and Management, December 1996, n. 8, v. 2 |
Page(s): | 101-109 |
DOI: | 10.3846/13921525.1996.10590177 |
Abstract: |
Co-ordination of a building enterprise activities alonside with division of labour represents the second essential organizational principle. Co-ordination is performed by four methods: by personal directives, self-managing, programmes and plans. The first two of them may be applied to the feed-back co-ordination and the preliminary one, others only to the preliminary co-ordination. A system of a building enterprise activities co-ordination can be measured by a system of indices. Such system includes partial measures expressing the scale of combining the application of co-ordinating mechanisms and a generalized index which unites in a certain way the partial indices. |
Copyright: | © 1996 The Author(s). Published by VGTU Press. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |