0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

State-of-the-Practice for Liquidated Damages, Incentive/Disincentive, and Road User Cost Provisions on High-Value Transportation Projects

This publication has been cited in the following 5 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10579917
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine